Background of the Proceedings
The Kerala High Court initiated suo motu proceedings in view of continuing road fatalities and systemic shortcomings in road safety across the State. The proceedings aim to ensure coordinated action by various government departments and authorities to prevent accidents.
Insufficient Speed Detection Systems
The Motor Vehicles Department informed the Court that 726 electronic surveillance cameras had been installed under the Safe Kerala Project. These include 675 AI cameras, 25 parking violation detection systems, 18 red-light violation detection systems and only four Speed Violation Detection Systems.
The Department further reported that 1,56,82,572 electronic challans had been issued up to October 30, 2026, imposing aggregate fines of ₹1,017.46 crore. However, details regarding the actual collection of fines were not furnished.
Considering the extensive electronic enforcement network and the number of violations detected, the Court found that four speed detection systems were insufficient.
Court's Observations and Directions
The Division Bench observed:
“Speeding is a significant road safety concern and requires focused and sustained enforcement.”
Accordingly, the Court directed the Transport Commissioner to identify locations witnessing frequent speed violations and accidents and take appropriate steps to install additional Speed Violation Detection Systems. The Commissioner was also directed to submit a report specifying the identified locations, proposed installations and implementation timeline.
The Court further directed the Transport Commissioner to formulate a comprehensive enforcement protocol incorporating regular monitoring, coordination and follow-up mechanisms.
Directions to Public Works Department
The Court expressed dissatisfaction with the PWD's affidavit, observing that it contained only general statements about its responsibilities and failed to address the findings of the Comptroller and Auditor General (CAG) concerning road construction and maintenance.
It directed the PWD to submit a detailed affidavit addressing the CAG observations, existing safety measures and proposed structural improvements, along with the relevant records.
Integrated Road Safety Monitoring Platform
Emphasising coordinated road safety management, the Court stressed the need for a State-wide, GIS-enabled Integrated Road Safety Monitoring Platform.
The proposed platform must incorporate facilities for citizens to report road hazards, track accident-prone locations, conduct safety audits, monitor road maintenance and fix accountability on responsible engineers.
The Court also directed the Director General of Police to nominate a competent police officer to the Steering Committee responsible for developing the platform.
The respondents were granted three weeks to submit concrete proposals and an updated implementation report. The matter was directed to be listed after November 30, 2026.
Case Details
Case Name: Suo Motu In Re: Road Safety in Kerala v. Chief Secretary, Government of Kerala & Ors.
Court: High Court of Kerala
Date of Decision: 03 November 2026
Case Number: WP(C) No. 35016 of 2026
Coram/Judges: Justice Raja Vijayaraghavan V. and Justice K.V. Jayakumar